|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
Working Group Fact SheetInCom 154Title: Mitre Gate Design and OperationThe main objective of the WG is identifying “Best Practices” for the design, fabrication, and operation of lock mitre gates.
Status:Reports:Mitre Gate Design and Operation (pdf, 238 KB) U.S. Representatives:Terms of Reference (TOR):
Mitre Gate Design and Operation (pdf, 228 KB) InCom 154: Mitre Gate Design and Operation (pdf, 234 KB)
revised 28 Feb 2011 |